BREAKING NEWS
img China’s Chang’e – 6 lunar passage returns to... img New Delhi: Gusty winds at 52km/hr bring in... img PM Modi promotes ‘Yoga economy’ and ‘yoga tourism’,... img PM Modi to launch projects worth 1800 Cr,... img P.M. Modi inaugurates New Nalanda University Campus: Key... img Yoga Enthusiasts Celebrate International Yoga Day in Washington... img Simone Biles’ life story to be released on... img Alka Yagnik reveals rare sensory hearing loss: It’s... img India-US increases cooperation and engagement in semiconductors, critical... img 5 Dead, 25 injured as goods train collides...

JSW Energy Secures 700 Megawatt Solar Project from SJVN

Synopsis : JSW Energy has also set ambitious environmental targets, including a 50 per cent reduction in carbon footprint by 2030 and ultimately achieving Carbon Neutrality by 2050.

Advertisement

JSW Energy Secures 700 Megawatt Solar Project from SJVN
logo
News Street Asia

New Delhi/ News Desk, February 29, 2024

On Tuesday 27th February 2024, JSW Energy announced that its subsidiary company JSW Neo Energy Limited has successfully secured a 700 Megawatt (MW) solar project from the Public Sector Undertaking (PSU) SJVN Limited. This Project win comes as a result of a tariff-based competitive bid invited for the establishment of 1500 MW Interstate Transmission System (ISTS)-connected solar power projects.

ALSO READ | https://newsstreetasia.com/nvidias-cloud-ai-and-market-expansion/ 

JSW Energy has secured a 700 MW capacity contract from SJVN Ltd, bringing its total secured capacity to 11.0 GW, which includes 1.4 GW of solar power. JSW Energy plans to provide power at the full contracted capacity within 2 years from the agreement’s start date.

JSW Energy boasts a total generation capacity of 11.0 GW

Currently, JSW Energy boasts a total closed generation capacity of 11.0 GW, of which 7.2 GW is in operation and 2.6 GW is in operation in the wind-heating, hydro projects, along with Letter of Awards (LoAs) for an additional 1.2 GW of capacity from SECI (Slice – XVI). and SJVN.

Moreover, the company thought it wise to put its money into energy storage systems and thus has 3.4 GWh of energy storage capacity locked in through two means: battery storage systems and pumped hydroelectricity stations.

Capacity to Increase to 9.8 GW by the end of calendar year 2024

Looking ahead, JSW Energy aims to significantly ramp up its operational generation capacity to 9.8 GW by the end of calendar year 2024, representing a notable increase from its current operational capacity of 7.2 GW.

ALSO READ | https://newsstreetasia.com/top-ten-e-commerce-companies/ 

JSW Energy has additionally set ambitious environmental targets, such as a 50% discount in carbon footprint by way of 2030 and in the long run achieving Carbon Neutrality using 2050. These commitments underscore the enterprise’s dedication to sustainability and smooth energy projects in keeping with worldwide climate goals.

Advertisement

Similar News